माझी Mumbai, आपली BMC(@mybmc) 's Twitter Profile Photo

🎥🌉The animation shows the engineering concept of installing the first giant girder (bow arch string girder), connecting the Mumbai Coastal Road and the Bandra-Worli Sea Link




dr amit saini
Mumbai Coastal Road Project

account_circle
Sameer(@BesuraTaansane) 's Twitter Profile Photo

Wowwww ...... I just got a fabulous sighting of the 'Coastal Road - Sea Link Connector' being transported through the sea from my window 🤩

Wowwww ...... I just got a fabulous sighting of the 'Coastal Road - Sea Link Connector' being transported through the sea from my window 🤩

#MumbaiCoastalRoad
account_circle
माझी Mumbai, आपली BMC(@mybmc) 's Twitter Profile Photo

🎥🌉मुंबई किनारी रस्ता आणि वांद्रे-वरळी सागरी सेतू मार्गाला सांधणारी पहिली महाकाय तुळई (बो आर्च स्ट्रिंग गर्डर) स्थापनेची अभियांत्रिकी संकल्पना स्पष्ट करणारी ही चित्रफित..




dr amit saini
Mumbai Coastal Road Project

account_circle
Media Eye News Mumbai(@Mediaeyenews) 's Twitter Profile Photo

A Successful Accomplishment in the Construction of the City’s Infrastructure: Worli Sea Link-Mumbai Coastal Road Connected at 3:25 AM Today mediaeyenews.com/news/city/a-su…

account_circle
DD Sahyadri News | सह्याद्री बातम्या(@ddsahyadrinews) 's Twitter Profile Photo

किनारी रस्ता आणि वांद्रे-वरळी सागरी सेतू मार्गाला सांधणारी पहिली महाकाय तुळई बसवण्यात यश.

Mumbai Coastal Road Project DD News @mybmc

account_circle
Sameer(@BesuraTaansane) 's Twitter Profile Photo

Awesome ... I was fortunate to get a nice long glimpse of this from my window as it was being transported to the site ❤️

- Sea Link Connector

Awesome ... I was fortunate to get a nice long glimpse of this from my window as it was being transported to the site ❤️ 

#MumbaiCoastalRoad - Sea Link Connector
account_circle
The Times Of India(@timesofindia) 's Twitter Profile Photo

The 2,000-metric-ton arch bridge, a critical component of the project which set sail from Mazagon Dock's Nhava unit on April 24, reached the project Worli Site on April 25.

The erection of the bridge was successfully completed today at 3:25 am

It will the…

The 2,000-metric-ton arch bridge, a critical component of the #MumbaiCoastalRoad project which set sail from Mazagon Dock's Nhava unit on April 24, reached the project Worli Site on April 25.

The erection of the bridge was successfully completed today at 3:25 am 

It will the…
account_circle
News18(@CNNnews18) 's Twitter Profile Photo

the BMC said that the process to launch the bow-string-arch-type girder, spanning 136 metres, at Worli started at 2 am and was completed at 3.25 am



news18.com/india/25000-to…

the BMC said that the process to launch the bow-string-arch-type girder, spanning 136 metres, at Worli started at 2 am and was completed at 3.25 am

#BMC #Worli #Girder #MumbaiCoastalRoad #SeaLink #MaharashtraNews 

news18.com/india/25000-to…
account_circle
Times Now Batmya(@timesnowbatmya) 's Twitter Profile Photo

गुड न्यूज! कोस्टल रोड आता वाहतुकीसाठी 16 तास खुला, विकेंडलाही करता येणार प्रवास

marathi.timesnownews.com/maharashtra/mu…

account_circle
Gujarati Midday(@middaygujarati) 's Twitter Profile Photo

મુંબઈમાં કોસ્ટલ રોડને બાંદ્રા વર્લી-સી લિંક સાથે જોડવામાં આવ્યો

Project Bridge Update

youtu.be/AzHIIOrcfJc

account_circle
महा MTB(@TheMahaMTB) 's Twitter Profile Photo

संयम आणि कौशल्यपणाला लावणारे १ तास २५ मिनिटे; मुंबई किनारी रस्ता प्रकल्पाने गाठला ऐतिहासिक टप्पा
माझी Mumbai, आपली BMC
mahamtb.com/Encyc/2024/4/2…

account_circle
Richa Pinto(@richapintoi) 's Twitter Profile Photo

By Wednesday evening, the arch bridge had already passed Colaba along the western shore and was expected to arrive at the project’s Worli site by late Wednesday night. .

account_circle
Richa Pinto(@richapintoi) 's Twitter Profile Photo

This arch bridge would connect the right hand side arm of coastal road with Bandra Worli sea link. The earlier plan was to shift the span from Mazagon Dock's Nhava Unit on April 21 which had to be postponed owing to the unsuitable climatic conditions. .

account_circle